Summary of the areas of land and buildings of GU:
1. Areas
- 1the existing space (2007/2008):
- Land area of the main campus with parking 32500 m 2
- The main parking area is 2275 2
- Total area of the building in the existing complex (except for sports stadiums *) 11 890 m 2
- An area of the building of additional educational building (E) 2850 m 2
- An area of office buildings in the Zinj Almahor 5010 m 2
- An area of land in Salmabad in 2094 2
- Vocational training in workshops and Salmabad Tubli in 2693 2
- Total area of the building for the accommodation of students, teachers and Oualemozvin (10 buildings) 18330 m 2
- All Inclusive 600 m 2
--------------------------------------------------------------------------------------------------
Total land area and floors added 78232 m 2
Two additions (October 2008):
- An area of land and construction of complex Khnezi adjacent to the University (building K1-6) 3100 m 2
- Built-up area for the accommodation of teachers and students in support and the surrounding areas 10000 m 2
Three additions (October 2011):
- Additional floors in the building of the main extension
Building academic and administrative 13 345 m 2
Parking added 3640 m 2
- Built-up area for the accommodation of students and professors 20000 m 2
--------------------------------------------------------------------------------------------------
Grand total 128 317 m 2
* The sports stadiums as follows:
o arena football
o Square Basketball
o Square Volleyball
o Square Handball
o tennis court
II - details of buildings and facilities: buildings include administrative offices, offices, a large hall and classrooms, laboratories, libraries, cafeteria services, and public facilities. The following are details of some of these titles:
A - laboratory and practical training
Laboratories current (2007/2008)
- Electrical Engineering Laboratory 1
- Chambers and Electrical Measurements
- Consumer electronics
- Communications Engineering
Electrical Engineering Laboratory 2
- Control Engineering
- Optoelectronics & Optical Communications
- Digital Electronics
Mechanical Engineering Laboratory
- Heat transfer
- Fluid Mechanics
Materials Engineering Laboratory
- Engineering Materials Laboratory
Civil Engineering Laboratory 1
- Laboratory Concrete
Architectural Engineering Laboratory
- Architectural design studio
- Free Atelier
- Business models architectural
- Design Computer
Computer Engineering Laboratories
- Computer Lab 1
- Computer Lab 2
- Computer Lab 3
General laboratory
- Laboratory of Physics and Geology
- Laboratory Chemistry & Biology
Moot Court Hall
School model applied to the College of Education
2 - Laboratories added in October 2008
Civil Engineering Laboratory 2
- Laboratory Soil Mechanics
Civil Engineering Laboratory 3
- Laboratory methods
Civil Engineering Laboratory 4
- Laboratory tests
Mechanical engineering workshop
Computer Lab 4 (CISCO)
Laboratory Technology Education
Laboratory and psychological tests
Language laboratory
3 - Laboratory (will be added in October 2011)
Applied management Laboratory 1
Laboratory of Applied Accounting 1
Laboratory Info rmation 2
Mechanical Engineering Laboratory 4
Laboratory Electrical and Electronic Engineering 5
Civil Engineering Laboratory 3
Laboratories architecture and engineering design procedure 4
Laboratories, computer engineering and information systems 7
Communications Engineering computer laboratories number 2
Language laboratories 2
B - Classrooms at Gulf University
1 - Hall current (2007/2008)
Site number of rooms capacity (students) the total number of seats
Classrooms (R201-210) i 2 10 45 450
Classrooms (R301-314) RN3 14 45 630
Halls ground (W) i 0 467 268
Classrooms in the building
E (E11-E24)
The seminar room (2816)
Blue Room (an area of 150 m 2)
Great Hall (an area of 500 m 2)
Grand total 44 * 2006 *
* Except for laboratory
** Means a capacity for 4400 students without the use of the Great Hall on the use of rooms at 75% of the time available and the rate of squatting 75% of the number of seats only, and based on the enrollment rate of 15 credit hours a student in the classroom. It can be increased absorptive capacity greatly improves efficiency and add the Great Hall.
2 - Classrooms (December 2008)
Site number of rooms capacity (students) the total number of seats
Classrooms (K1-6) i-1 630 180
The main compound (R101-105) i-1 545 225
Total 11 405
* Added capacity of 1100 students
3 - Classrooms (to be added in October 2011)
Site number of rooms capacity (students) the total number of seats
Supplement the main 36 401 440
Supplement the main 48 602 880
Total 844 320
* Added capacity of 11650 students |